As part of a risk analysis, technical risks are analyzed. Which TWO factors influence technical risk?
A component has been analyzed as being highly critical. Which of the following structure-based test design techniques provides the highest level of coverage?
The result of a product risk analysis performed on components I, II and III of the airplane control system shows the following risk matrix:

The project wants to mitigate the risks by defining different types of coverage depending on the risk level of the components. Which of the following would be a meaningful solution for setting the coverage targets?
Consider the following fault attack: "Force all possible incoming errors from the software/OS interfaces to the application". Which of the following is the kind of failure you are looking for when using this attack?
How many test cases would be needed to achieve 100% decision coverage?