Which of the following steps will need to be completed to continue to use Elastic CoD on the Power System E980?
✑ There will be four client partitions, each of which will be connected to VLAN1 and VLAN2.
✑ There will be two VIOS.
✑ Redundant Ethernet connections will be accomplished using the Shared Ethernet Adapter (SEA) and dual VIOS.
What is the minimum number of Ethernet ports that will be required in each VIOS?
Which of the following products should be recommended?
Which resource provides the SMT2 performance of the two systems?