Question 6 of 55In a project 32 NetCol8000-Cs need to be networked for teamwork. Each group consists of four air conditioners. How should the northbound RS485 grouping switches, namely, toggle switches 2 and 3 on the main control module, be set for the last air conditioner in each group?
Correct Answer: D
Question 7 of 55Which of the following statements about the functions of the AC PDB is false?
Correct Answer: D
Question 8 of 55Which of the following position is recommended for installing the smart ETH gateway?
Correct Answer: B
Question 9 of 55When installing a water-cooled module, what is the minimum distance between the module and the wall?
Correct Answer: D
Question 10 of 55On the ECC800-Pro WebUI, which of the following is the first-level menu of the NMS Application?