Question 6 of 40

What two options are available for excluding data from workload compliance calculations? (Choose two.)
Answer

Suggested Answer

The suggested answer is A, C.

Question 7 of 40

Due to space restrictions at the data center for the PowerMax 8500 system, the existing six node pairs with four DMEs are limited to grow within its existing rack.
What is a valid upgrade option in this scenario?
Answer

Suggested Answer

The suggested answer is A.

Question 8 of 40

Due to a compatibility issue, it has been decided to use O-MDM to migrate an old Linux host from a VMAX 20K system to a PowerMax 2500 system.
At what point during the migration workflow do you request the power off of the migrating Linux host?
Answer

Suggested Answer

The suggested answer is B.

Question 9 of 40

An application is protected with SRDF/A with a fast and reliable replication link.
How should the minimum cycle time be set to provide minimal data loss?
Answer

Suggested Answer

The suggested answer is B.

Question 10 of 40

A customer has requested your assistance with planning their future data centers in both their primary and secondary locations, both of which will be residing in the state of New York.
Which two SRDF topologies are valid for this two-site configuration? (Choose two.)
Answer

Suggested Answer

The suggested answer is A, C.