Question 6 of 48

What is a prerequisite for installing the TPM after replacing the system board in a PowerScale F900?
Answer

Suggested Answer

The suggested answer is C.

Question 7 of 48

Refer to the exhibit.
Exam d-psc-mn-01: Image 1
A platform engineer has connected power cables to a Dell PowerScale Gen6 node.
What does the status indicator indicate?
Answer

Suggested Answer

The suggested answer is D.

Question 8 of 48

A platform engineer is building a new Dell PowerScale cluster. The Configuration Wizard prompts for a cluster name.
What is a consideration when entering the cluster name?
Answer

Suggested Answer

The suggested answer is D.

Question 9 of 48

Refer to the exhibit.
Exam d-psc-mn-01: Image 1
An engineer replaces the drive in C1. They run the isi devices drive list command and obtain the output that is shown.
What action must the engineer take?
Answer

Suggested Answer

The suggested answer is D.

Question 10 of 48

A platform engineer must decide whether to reformat or reimage a Dell PowerScale node that is running the latest OneFS version.
What is a consideration?
Answer

Suggested Answer

The suggested answer is C.