Refer to the exhibit.
Exhibit 1.

Exhibit 2.

The routing configuration must support this behavior:
Server 1 and Server 2 communicate over Link 1 when Link 1 is up.
If Link 1 fails, Server 1 and Server 2 can continue to communicate over the path through Switch-3.
What must the network administrator change to meet these criteria?