001_ISTQB Certified Tester Foundation Level (CTFL_001) Exam Questions

Here you have the best ISQI CTFL practice exam questions.

Some things you may want to keep in mind about this practice exam questions:

  • You have 87 total questions to study from
  • Each page has 5 questions, making a total of 18 pages
  • You can navigate through the pages using the buttons at the bottom
  • This questions were last updated on September 13, 2024

Question 1 of 87


The four test levels defined for a common V-model testing approach are:

    Correct Answer: C

    The four test levels defined for a common V-model testing approach are component, integration, system, and acceptance. Each of these stages corresponds to a different phase of software development and ensures thorough testing of the software product at multiple levels of granularity. Thus, the correct answer is component, integration, system, and acceptance.

Question 2 of 87


Typically, exit criteria may consist of:

    Correct Answer: B

    Exit criteria typically include estimates of defect density or reliability measures to assess whether the software product has met the required quality standards and is ready for release. This ensures that sufficient testing has been done and that the product is reliable and free of critical defects before moving on to the next phase or release.

Question 3 of 87


A data driven approach to test automation design is best described as:

    Correct Answer: D

    A data-driven approach to test automation design involves separating the test data from the test scripts. This means using a generic test script that can read varying test data inputs and perform the same test steps with different sets of data. This approach allows for greater flexibility and scalability in testing, as new test cases can be created simply by adding new data sets without modifying the test scripts themselves.

Question 4 of 87


Which of the following risks represents the highest level of risk to the project?

    Correct Answer: B

    To determine the highest level of risk to the project, we calculate the expected cost of impact for each option, which is the product of the likelihood of failure and the potential cost of impact. For option A: 1% of $1,000,000 equals $10,000. For option B: 10% of $500,000 equals $50,000. For option C: 20% of $150,000 equals $30,000. For option D: 5% of $500,000 equals $25,000. Option B has the highest expected cost of impact, therefore it represents the highest level of risk to the project.

Question 5 of 87


What factors should be considered to determine whether enough testing has been performed?

(i)The exit criteria.

(ii)The budget.

(iii)How big the test team is.

(iv)The product's risk profile.

(v)How good the testing tools are.

(vi)Sufficient details of the system status to allow decisions

    Correct Answer: A

    To determine whether enough testing has been performed, it is essential to consider the exit criteria, which provide clear guidelines for when testing is complete. The budget is also a critical factor, as limited resources can constrain the amount of testing that can be done. The product's risk profile is important because higher-risk products may require more extensive testing to mitigate potential issues. Additionally, having sufficient details of the system status allows informed decision-making regarding the adequacy of testing. These factors (i, ii, iv, and vi) are key to making an informed determination about the completeness of the testing process.