Which order of steps should an administrator use to replace a failed host in a stretched cluster?
Which order of steps should an administrator use to replace a failed host in a stretched cluster?
The correct order of steps should be: decommission the failed host first to ensure it is properly taken out of service. Then, remove the host from the cluster using cluster APIs to clean up configurations tied to the cluster. After that, commission the new host with the correct network settings to make it ready for cluster integration. Finally, add the newly commissioned host to the cluster using cluster APIs to register it as a part of the cluster. This sequence ensures that the failed host is fully removed before integrating the new one with correct network settings, and only then adding it to the cluster.
Anwer is correct https://docs.vmware.com/en/VMware-Cloud-Foundation/4.5/vcf-admin/GUID-92FD3AEE-5B5F-421C-B722-44AE0314D84E.html
C is right https://docs.vmware.com/en/VMware-Cloud-Foundation/5.0/vcf-admin/GUID-2C3E06BA-7B77-4F4B-958C-1BFCB3E9CBA7.html