Question 45

DRAG DROP -

Drag and drop the high-level configuration steps for smart card authentication on the left into the correct sequential order on the right.

Select and Place:

    Correct Answer:

Discussion
Garb71

Es correcto: https://docs.vmware.com/en/VMware-Horizon/2111/horizon-console-administration/GUID-FA1A85D8-07B1-4140-A34B-7F20618083CE.html

3vilSt3ven

Write in english please

cdealbero2

rude reply

MoHelal

Answer is correct. Prepare AD is the last step as per. https://docs.vmware.com/en/VMware-Horizon/2111/horizon-console-administration/GUID-9489C56C-B793-4022-8140-CF84AE8C194C.html

linkin2023

asnwer is wrong- the correct one is Obtain then Add then Prepare and last one is Configure