VCF design workshops were conducted, and the architect collected the following customer requirements for the newly planned VCF infrastructure:
The new VCF infrastructure must target two zones: DEV/UAT and DMZ.
The security team would like to have full management and network isolation between these two zones.
12 hosts have been ordered for the solution.
DEV/UAT workloads must comply with an erasure coding vSAN storage policy with the ability to tolerate the failure of two hosts.
Which workload domain sizing will be required to achieve these requirements?