Question 54

A project on developing quality testing equipment for an agro-based industry will start with the Create Deliverables process. Which of the following are NOT inputs to the current process?

A) Scrum Core Team -

B) Acceptance Criteria -

C) Impediment log -

D) Length of Sprint -

    Correct Answer: B

    The Create Deliverables process in a Scrum project has specific inputs. According to standard Scrum guidelines, the inputs typically include the Scrum Core Team, the Sprint Backlog, the Scrumboard, and possibly the Impediment Log. The Acceptance Criteria is usually considered part of the Sprint Backlog, but Length of Sprint is a timeboxing factor and is not a direct input to the Create Deliverables process. Therefore, the correct answer is 'B and D' as these are not direct inputs to the process.

Discussion
ekmodeOption: B

Answer: B SBOK GUIDE - 10.1 Create Deliverables INPUTS ARE 1. Scrum Core Team* 2. Sprint Backlog* 3. Scrumboard* 4. Impediment Log*

patricpotter1992

Definitely B. Thank you.