All VMs in a data center need to be failed over to a disaster recovery site due to an approaching hurricane. Which failover method would ensure that changes made to the original VMs, after the scheduled replication jobs, are copied to the disaster recovery site?

    Correct Answer: B

    To ensure that changes made to the original VMs after the scheduled replication jobs are copied to the disaster recovery site, the most appropriate method is a planned failover. Planned failover involves synchronizing the source VMs with the replicas just before the failover, ensuring all recent changes are included. This method is specifically designed to prevent data loss by making sure that the most up-to-date information is transferred to the disaster recovery site.

Discussion
jack98Option: B

B. Planned failover