How does UiPath handle different dependency versions for multiple running processes that run at the same time?
How does UiPath handle different dependency versions for multiple running processes that run at the same time?
UiPath handles different dependency versions for multiple running processes by allowing each process to use its own required version of the dependency. This means that processes running simultaneously are able to function with the specific versions they need, without interference from the versions required by other processes. For instance, if one process requires version A of a dependency and another process requires version B, both versions will be used independently to ensure that each process runs smoothly.
B. Each running process uses its own required version of the dependency. "Each running process uses its own version of dependencies, even if multiple running processes require a different version of the same dependency. For example, if process A requires dependency v18.4.6 and process B requires dependency v19.4.4, then each process downloads and uses its required version of the dependency." https://docs.uipath.com/robot/standalone/2023.10/user-guide/background-process-automation
Answer is B.