SnowPro Core Exam QuestionsBrowse all questions from this exam

SnowPro Core Exam - Question 74


True or False: Pipes can be suspended and resumed.

Show Answer
Correct Answer: A

Pipes can be paused and then resumed. This means that the process of data loading or data transfer facilitated by the pipe can be temporarily stopped (paused) and then restarted (resumed) without losing its state or creating issues. Therefore, the statement is true.

Discussion

16 comments
Sign in to comment
jjordanOption: A
Jan 1, 2022

https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro.html#pausing-or-resuming-pipes Pausing or Resuming Pipes In addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe:

moon2351Option: A
Jan 3, 2022

In addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe

JtravismillerOption: B
Jan 25, 2023

I lean towards B as there might be a difference between "suspended" and "paused".

LuYan18Option: B
Apr 9, 2024

Pausing or Resuming Pipes

Fab33Option: A
Jan 12, 2022

Selected Answer: A

rsmuruganOption: A
Jan 16, 2022

Answer A

Sid460545Option: A
Jan 31, 2022

Can be suspended and resumed

kjdfsafc87456Option: A
Aug 24, 2022

The answer is correct as the pipe can be stoped and resumed not b!

Tapasgup007Option: A
Dec 7, 2022

A is correct

baig123Option: A
Dec 16, 2022

A is correct Answer.

ajay_1233456Option: A
Jan 22, 2023

A is correct

Raju039Option: A
Mar 2, 2023

A is correct.

nencheppanOption: A
Mar 16, 2023

A IS COORECT

Mayuri917233Option: B
May 11, 2023

B is correct

Avi0407Option: B
Oct 30, 2023

CAN PAUSE, BUT PIPE SUSPENDED...? I DIDN'T SEE ANYWHERE

Mallikharjuna452Option: A
Jul 18, 2024

YES, A IS CORRECT