Exam SnowPro Core All QuestionsBrowse all questions from this exam
Question 74

True or False: Pipes can be suspended and resumed.

    Correct Answer: A

    Pipes can be paused and then resumed. This means that the process of data loading or data transfer facilitated by the pipe can be temporarily stopped (paused) and then restarted (resumed) without losing its state or creating issues. Therefore, the statement is true.

Discussion
jjordanOption: A

https://docs.snowflake.com/en/user-guide/data-load-snowpipe-intro.html#pausing-or-resuming-pipes Pausing or Resuming Pipes In addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe:

moon2351Option: A

In addition to the pipe owner, a role that has the following minimum permissions can pause or resume the pipe

JtravismillerOption: B

I lean towards B as there might be a difference between "suspended" and "paused".

LuYan18Option: B

Pausing or Resuming Pipes

Mallikharjuna452Option: A

YES, A IS CORRECT

Avi0407Option: B

CAN PAUSE, BUT PIPE SUSPENDED...? I DIDN'T SEE ANYWHERE

Mayuri917233Option: B

B is correct

nencheppanOption: A

A IS COORECT

Raju039Option: A

A is correct.

ajay_1233456Option: A

A is correct

baig123Option: A

A is correct Answer.

Tapasgup007Option: A

A is correct

kjdfsafc87456Option: A

The answer is correct as the pipe can be stoped and resumed not b!

Sid460545Option: A

Can be suspended and resumed

rsmuruganOption: A

Answer A

Fab33Option: A

Selected Answer: A