A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.

Show Answer
Correct Answer: A

A periodic time frame is essential in statistical process control (SPC) to calculate Control Limits and Center Lines accurately. This helps in maintaining process stability and detecting any variations over time.

Discussion

1 comment
Sign in to comment
AramadanOption: A
Dec 25, 2022

A. True