Exam PSM II All QuestionsBrowse all questions from this exam
Question 48

Steven is a Scrum Master on a new Scrum Team.

What would be the best way for him to determine if the Product Owner is interacting enough with the Development Team during a Sprint?

    Correct Answer: B

    To determine if the Product Owner is interacting enough with the Development Team during a Sprint, one effective way is to check whether the Increment presented at the Sprint Review meets the Product Owner's expectations. This approach assesses the effectiveness of their collaboration and communication throughout the Sprint, directly reflecting whether the Product Owner provided sufficient guidance and information to the Development Team.

Discussion
eacunhaOption: B

B. Verifique se o Incremento apresentado na Sprint Review atende às expectativas do Product Owner. Ao verificar se o Incremento atende às expectativas do Product Owner durante a Sprint Review, Steven pode determinar se o Product Owner está interagindo o suficiente com a equipe durante o Sprint. Isso permite avaliar se a colaboração e a comunicação entre o Product Owner e a Equipe de Desenvolvimento estão ocorrendo de maneira eficaz.

GatapardaOption: B

C is not correct. B is correct. PO presence in Sprint Planing ist important.

Luke_1301Option: B

By inspecting the quality of the Increment, the Scrum Master can measure the level of interaction between the PO and Developer

amogOption: C

C is correct