Which calculation procedure version in the list would execute on 2/15/2020 at 12:00 PM?
Which calculation procedure version in the list would execute on 2/15/2020 at 12:00 PM?
The calculation procedure that executes on 2/15/2020 at 12:00 PM must have a start date on or before 2/15/2020 and an end date after 2/15/2020, and it must be enabled. Version Number 2 fits these criteria, as it starts on 2/1/2020 and ends on 3/1/2020, and it is enabled. Since multiple enabled procedures can be valid at the same time, the one with the highest priority (lowest priority number) will be executed. Therefore, Version Number 2 is the correct answer.
Answer must be B since A and B B got highest priority
Answer is B as Priority 1 is the lowest. Versioning for Calculation Procedures is the same as it is for Calculation Matrices. The Calculation Procedure version is valid between the start time and end time, and if there are multiple versions that are valid, then the highest priority will be run (1 is the lowest priority). You can have multiple versions, and they will automatically rollover.
B is the right answer
Answer must be A. A and B are correct but due to priority answer must be A
B is correct
B. D is not even enabled