Universal Containers has a strict change management process that requires all possible configuration to be completed in a sandbox which will be deployed to production. The Al Specialist is tasked with setting up Work Summaries for Enhanced Messaging. Einstein Generative Al is already enabled in production, and the Einstein Work Summaries permission set is already available in production.
Which other configuration steps should the AI Specialist take In the sandbox that can be deployed to the production org?