PRINCE2-Foundation Exam - Question 137


Which is a minimum requirement for applying the plans theme?

Show Answer
Correct Answer: A

The minimum requirement for applying the plans theme in PRINCE2 is that the project must have at least two management stages. PRINCE2 mandates an initiation stage and at least one additional management stage to ensure effective project control and delivery. Team plans are considered optional and are not a minimum requirement for all projects. Therefore, having two management stages is essential for meeting the minimum criteria of the plans theme.

Discussion

17 comments
Sign in to comment
GetRajOption: A
Jul 7, 2020

Option A is correct

GLKTYIOption: A
Jul 22, 2020

Team plan is optional, not minimum requirement it should be A

LenlenlenOption: A
Jul 24, 2020

should be A

MehanOption: A
Jan 14, 2021

100% A is correct

JimethOption: A
Jul 31, 2020

Team plans are not mandatory. Answer is A

sohrabianiOption: A
Oct 4, 2020

A is correct - The Team plan is not mandatory

AgnesMOption: A
Oct 30, 2020

Definitely answer A is correct..

VJ80Option: A
Dec 12, 2022

pince2wiki is done by a blogger and those cannot be used as reference to choose the answer. as per grey campus the option A is correct and they are recognised institute to train on prince2

GetRaj
Jul 7, 2020

Refer 9.2 PRINCE2's requirements for the plans theme in MSP Book

King_LapsOption: A
Oct 31, 2022

A should be correct here

AdrienneOption: A
Sep 18, 2023

"A" is the correct answer, as Team plans are not mandatory, however, the 2 stages - "Initializing a project", "Closing a project" - are.

alir20Option: A
Jan 16, 2024

"A" is the correct answer, as Team plans are not mandatory, however, the 2 stages - "Initializing a project", "Closing a project"

peppeOption: A
Oct 19, 2021

A is correct

AnapellicerOption: B
Mar 9, 2023

B is correct. Team plans are an essential component of the Plans theme, as they detail how specific teams will contribute to the overall project plan. The other options listed may be useful in project management, but they are not specific requirements for applying the Plans theme

SGN63Option: A
Mar 11, 2023

should be A

FireyOption: A
Jul 23, 2023

Plans theme minimum requirements: • Ensure that plans enable the business case to be realised, • Have at least 2 management stages: an initiation stage and at least 1 other management stage. The more complex and riskier a project, the more management stages that will be required. • Produce a project plan for the project as a whole and a stage plan for each management stage. • Use product-based planning for the project plan, stage plans and exception plans. • Produce specific plans for managing exceptions. • Define the roles and responsibilities for planning. •Use lessons to inform planning. Definition: Team plan - An optional level of plan used as the basis for team management control when executing work packages. In a PRINCE2 project the team plan is produced by the Team Manager.

Haranp12Option: A
Oct 5, 2023

Definitely option A