All of the following are resources that need to be monitored and controlled except for which one?
All of the following are resources that need to be monitored and controlled except for which one?
Quality is a critical aspect of project management but it is not considered a resource in the same sense as equipment, staff, or facilities. Quality is a measure of how well the project meets the requirements and standards, and it is controlled through quality management processes. Equipment, staff, and facilities are tangible resources that need to be monitored and controlled to ensure the project's smooth operation.
Ans D: Facilities Facilities are maintained; The other 3 are monitored and controlled.
C is correct answer. All of the following are resources that need to be monitored and controlled except for: Quality Explanation: Equipment: Tools and machinery required for project tasks must be monitored for availability, condition, and proper usage. Staff: Human resources need to be monitored for their allocation, performance, and availability. Facilities: Physical locations or spaces used for the project need to be monitored for access, suitability, and maintenance. Quality is a critical aspect of project management but it is not considered a "resource" in the same sense as equipment, staff, or facilities. Quality is a measure of how well the project meets the requirements and standards, and it is controlled through quality management processes, not monitored and controlled as a resource.