PCNSE Exam QuestionsBrowse all questions from this exam

PCNSE Exam - Question 513


An engineer notices that the tunnel monitoring has been failing for a day and the VPN should have failed over to a backup path.

What part of the network profile configuration should the engineer verify?

Show Answer
Correct Answer: C

When the VPN fails to switch to a backup path, the action taken during such events must be examined. This ensures that the system is set to properly handle such failures by initiating the failover. The 'Action' parameter in the monitoring settings dictates what occurs when certain thresholds or conditions are met, such as switching to a backup path. Verifying this configuration ensures that failovers happen correctly.

Discussion

8 comments
Sign in to comment
abanaabaOption: C
Jun 11, 2023

C is the correct

Knowledge33Option: B
Jun 16, 2023

The question should says "monitor profile", not "network profile". Anyway, the answer is B. https://knowledgebase.paloaltonetworks.com/KCSArticleDetail?id=kA10g000000POO0CAO

Knowledge33
Jun 16, 2023

Sorry, I meant "c"

Knowledge33Option: C
Jun 16, 2023

Answer is C

blahblah1234567890000Option: C
Jun 18, 2023

C is the correct

Betty2022Option: C
Jul 29, 2023

C: Configure a Monitoring Profile. Network > Network Profiles > Monitor > Add Make sure "Fail Over" Option is selected. < Action Settings https://knowledgebase.paloaltonetworks.com/KCSArticleDetail?id=kA10g000000POO0CAO

Andromeda1800Option: C
Dec 14, 2023

C, Action

MarshpillowzOption: C
Feb 4, 2024

C is correct

8f3e6caOption: C
Jun 27, 2024

Why are there so many wrong solutions given as the correct answer?