Exam PCCSE All QuestionsBrowse all questions from this exam
Question 78

A customer has a large environment that needs to upgrade Console without upgrading all Defenders at one time.

What are two prerequisites prior to performing a rolling upgrade of Defenders? (Choose two.)

    Correct Answer: A, E

    To perform a rolling upgrade of Defenders, you need to ensure that you have the latest version of the twistcli tool manually installed before the upgrade process begins. This tool is crucial for handling the upgrades and deployments. Additionally, it is necessary to have the existing Console at version n-1 to ensure compatibility and a smooth transition during the rolling upgrade process.

Discussion
HARRYOptions: CE

CE is correct

Redrum702Options: AE

A/E https://github.com/PaloAltoNetworks/prisma-cloud-docs/blob/master/compute/admin_guide/upgrade/upgrade_process_self_hosted.adoc

SpippoloOptions: AE

For exclusion. https://docs.paloaltonetworks.com/prisma/prisma-cloud/prisma-cloud-admin-compute/upgrade/upgrade_process_saas After the Console has been upgraded, check and upgrade any of the Defenders that have reached the end of their support lifecycle (Defenders are backward compatible for N-2 releases). The Defender release image is built from the UBI8-minimal base image and on upgrade it is a full container image upgrade, which means that the old Defender container is replaced with a new container. Then, upgrade all other Prisma Cloud components, such as the Jenkins plugin.

Chichi23Options: AE

A. manual installation of the latest twistcli tool prior to the rolling upgrade E. an existing Console at version n-1