Question 17

An administrator has two clusters: Site A and Site B.

Async DR is configured between the clusters as follows:

✑ Site A is the Primary Site

✑ Site B is the Secondary inactive Site, no VMs running

✑ Site A is fully in Production

✑ Site B used as Backup/Disaster Recovery

The customer wants to perform a planned failover between the sites. How should the administrator accomplish this?

    Correct Answer: A

    To perform a planned failover to the secondary site (Site B) in an async DR setup, the administrator should click 'Activate' on the Secondary site within the Data Protection Dashboard. This action activates the secondary site and transitions control from the primary to the secondary site, ensuring that Site B takes over with the latest replicated data from Site A.

Discussion
Cromo19Option: D

Answer is D.