Exam ncp-mci-v65 All QuestionsBrowse all questions from this exam
Question 35

An administrator needs to increase bandwidth available to the AHV host and to the CVM.

How should the administrator complete this task?

    Correct Answer: D

    To increase the bandwidth available to the AHV host and CVM, the administrator should update the network configuration in Prism. By navigating to the Network Configuration section and updating the configuration of the existing virtual switch (vs0) to Active-Active, the available bandwidth can be increased for both the AHV host and CVM. This method utilizes the bonded network adapters to ensure better utilization of network resources.

Discussion
Hotwired34Option: D

I'm a little confused by this one. I know in the later versions of AHV (5.19+) updating the VS can be done via Prism, which is what I think this is referring to. Looking at the following link, I believe the answer is D. https://portal.nutanix.com/page/documents/solutions/details?targetId=BP-2071-AHV-Networking:load-balancing-in-bond-interfaces.html

Blitz1Option: A

For sure A 1) because as AOS 5.19 or newer is is possible to do it from PE and PC 2) in the below link there is a BIG WARNING saying that UPDATING ( key word like in question) the br0 will actually delete and create a new one with default configuration - which means destroying any other configuration that you have... https://portal.nutanix.com/page/documents/kbs/details?targetId=kA0320000004H0vCAE

Blitz1

I wanted to vote D .. D is the correct answer as per above.

alexandreozOption: A

I believe A is the right one

PatigOption: D

Update Prism Settings: Access Prism (the Nutanix management interface). Navigate to the Network Configuration section. Update the Virtual Switch (vs0) configuration to use the Active-Active bond. This change ensures that the CVM can utilize the increased bandwidth provided by the bonded network adapters.

Hotwired34Option: A

I believe this is A