You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site.
Referring to the exhibit, which steps are required to get an HA cabled system?
You install a new FAS2650 HA with a DS224C disk shelf and ONTAP 9.5 on a customer site.
Referring to the exhibit, which steps are required to get an HA cabled system?
To set up an HA (High Availability) cabled system for a NetApp FAS2650 with a DS224C disk shelf running ONTAP 9.5, follow these steps: Connect a cable from the right controller port 0a to IOMA port 1, and from port 0b to IOMB port 3. Then, connect a cable from the left controller port 0a to IOMB port 1, and from port 0b to IOMA port 3. This configuration ensures proper communication and redundancy between the controllers and the respective ports.
Correct answare is B. https://library.netapp.com/ecm/ecm_download_file/ECMLP2316768
B. N2: 0a -> A1; 0b -> B3 N1: 0a -> B1; 0b -> A3