NS0-184 Exam QuestionsBrowse all questions from this exam

NS0-184 Exam - Question 82


You are preparing to install a new 4-node ONTAP 9.8 cluster. You have a pair of new Broadcom BES-52348 cluster switches.

In this scenario, what are three requirements for the successful installation of the cluster switches? (Choose three.)

Show Answer
Correct Answer:

Discussion

5 comments
Sign in to comment
n20dOptions: ACE
Aug 14, 2024

100GbE for connectivity between switches, RCF and EFOS

slizla
Sep 29, 2024

BCE Not A - if you want to use 100 GbE ports you need license file. Port 1-16 are 10/25 GbE base ports. For any additional ports from 17 and higher you need to purchase license file. It is a tricky question.

slizla
Sep 29, 2024

To be more precise - The base configuration includes licenses for only two 100GbE ports, which are typically used for Inter-Switch Links (ISL). If you need to use 100GgE for intercluster connection you must license file.

slizla
Sep 29, 2024

I checked in hu. Key word is twinax. Interconnect cable is twinax. So, you need a pair of 10 GbE twinax cables for cluster interconnection. ISL cables are not twinax cables.

scanossaOptions: ACE
Apr 8, 2025

"requirements for the successful installation of the cluster SWITCHES" Switches are mentioned and not the cluster 100GbE Twinax cables can be used for inter switch connection (ISL) and you will need a "pair" of them and i think it will take more than a pair of 10GbE for the cluster interconnection. Base configuration of the switch includes license for two 100GbE ports for the ISL In my opinion, the correct answers would be A,C,E