You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF.
In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)