Your customer plans to expand a 2-node FAS2750 switched cluster with two new controllers.
In this scenario, which two prerequisites should you examine in advance? (Choose two.)
Your customer plans to expand a 2-node FAS2750 switched cluster with two new controllers.
In this scenario, which two prerequisites should you examine in advance? (Choose two.)
When expanding a 2-node FAS2750 switched cluster with new controllers, it is essential to verify two key prerequisites. First, ensure that the existing switches support the additional controllers since the switches need to handle the increased network traffic and connections. Second, confirm that the platform of the new controllers can be mixed with the existing ones in the cluster as compatibility between different hardware models is crucial for the cluster's stability and performance.
Must be C+D. The controllers of the old cluster don't access the new drives, so A is not neccessary, and the new root volumes are created on the new controllers so they don't need space on the old cluster, so B is also not neccessary.
https://docs.netapp.com/us-en/ontap-sm-classic/expansion/task_adding_or_replacing_switches.html https://docs.netapp.com/us-en/ontap-sm-classic/expansion/task_verifying_planned_configuration.html
Answer is CD