Exam NS0-183 All QuestionsBrowse all questions from this exam
Question 57

Click the Exhibit button.

You are adding new DS224C shelves in a new stack to your cluster with FAS8060 controllers running ONTAP 9.7.

Referring to the exhibit, which two actions should be performed to the cluster before installing the new shelves? (Choose two.)

    Correct Answer: A, B

    To install new DS224C shelves in a new stack for a cluster with FAS8060 controllers running ONTAP 9.7, you need to move the SAS cables to a new stack and enable in-band ACP. The DS224C shelves require in-band ACP, so enabling in-band ACP is necessary for the new shelves to function correctly. Moving the SAS cables to a new stack is important to ensure the proper setup and connectivity of the new shelves.

Discussion
e3lOptions: BC

B and C, the new 224C shelf only support inband. When the existing shelf is IOM6 is supports inband ACP. Therefor convert ACP to inband and remove old ethernet cables because they're not needed anymore