Question 12

You are preparing to physically install a new AFF A400 cluster into a customer’s racks. All equipment has been delivered to the customer’s site.

Which three tools do you need to complete this installation? (Choose three.)

    Correct Answer: B, D, E

    To physically install a new AFF A400 cluster into a customer’s racks, you need specific tools that will assist with the mechanical installation. A Phillips #2 screwdriver is necessary for tightening screws. The slide rail kit is essential for mounting the equipment securely into the racks. The cable management tray is also needed to organize and manage the network cables cleanly and efficiently. Additional network cables and a laptop computer, while they may be useful later in the setup process for configuration and connectivity, are not required tools for the physical installation of the equipment into the racks.

Discussion
HangLiuOptions: ABC

https://docs.netapp.com/us-en/ontap-systems/media/PDF/215-14510_2020_09_en-us_AFFA400_ISI.pdf

scanossaOptions: ABC

https://docs.netapp.com/us-en/ontap-systems/media/PDF/215-14510_2020_09_en-us_AFFA400_ISI.pdf

MiguelXcoOptions: ABC

https://docs.netapp.com/us-en/ontap-systems/media/PDF/215-14510_2020_09_en-us_AFFA400_ISI.pdf