Exam NS0-184 All QuestionsBrowse all questions from this exam
Question 54

You are deploying an 8-node AFF A700 by using BES-53248 cluster switches. During the installation, you notice that ports higher than 16 are not coming online. You verify that the additional licenses are installed.

Which two additional steps must be taken to bring the additional ports online? (Choose two.)

    Correct Answer: B, C

    To bring the additional ports online in a BES-53248 switch, reloading the RCF file (switch configuration files) ensures that the switch ports are correctly configured, which is often necessary after licensing changes. Re-enabling each port may also be required to activate the ports and re-establish their connection status. Reloading the switch or firmware is generally not targeted specifically to bringing additional ports online after configuration changes.

Discussion
HangLiuOptions: BD

https://docs.netapp.com/us-en/ontap-systems-switches/switch-bes-53248/replace-install-rcf.html#reset-the-broadcom-ip-switch-to-factory-defaults