MB-320 Exam - Question 48


SIMULATION -

You are a functional consultant for Contoso Entertainment System USA (USMF).

You need to configure the system to ensure that a production release to a warehouse only occurs when the complete list of required components for a product is physically available.

To complete this task, sign in to Dynamics 365 portal.

Show Answer
Correct Answer:

To ensure that a production release to a warehouse occurs only when all required components are physically available, you need to configure the system settings correctly. Follow these steps: 1. Navigate to Production control > Setup > Production parameters. 2. On the 'General' tab within the 'RELEASE TO WAREHOUSE' group, you will find the 'Requirement for material reservation' field. Set this field to 'Require full reservation'. This setting ensures that the system will only release a production order to the warehouse when all necessary materials are fully reserved and available. This setup helps prevent partial releases which could lead to production delays or inefficiencies.

Discussion

1 comment
Sign in to comment
viking1
Jul 26, 2021

The field is called "Requirement for material reservation", and can be found in the "RELEASE TO WAREHOUSE" group on the "General" tab.