PL-300 Exam QuestionsBrowse all questions from this exam

PL-300 Exam - Question 144


You create a Power BI report named Summary1.

You discover that Summary1 is slow.

You run Performance analyzer to identify performance metrics for Summary1.

Which two metrics display the execution duration in Performance analyzer? Each correct answer present part of the solution.

NOTE: Each correct answer is worth one point.

Show Answer
Correct Answer:

Discussion

5 comments
Sign in to comment
Ash_34Options: BE
Sep 7, 2024

Answer is correct!

jaumeOptions: BE
Nov 20, 2024

DAX query and Visual Display are the metrics available in Performance Analyzer

ChopChop007Options: BE
Sep 20, 2024

Dax Query Visual Display

OdidepseOptions: BE
Jan 14, 2025

Dax and Visual Display from https://learn.microsoft.com/en-us/power-bi/create-reports/desktop-performance-analyzer . Excerpt from the link: Each visual's log information includes the time spent (duration) to complete the following categories of tasks: DAX query - If a DAX query was required, this is the time between the visual sending the query and Analysis Services returning the results. Visual display - This is the time required for the visual to draw on the screen, including the time required to retrieve any web images or geocoding. Other - This is the time required by the visual for preparing queries, waiting for other visuals to complete, or performing other background processing. Evaluated parameters (preview) - This is the time spent evaluating the field parameters within a visual. Learn more about field parameters (preview).

sroumiOption: C
Apr 17, 2025

Correct Answer: ✅ Sales reports (Power BI workspace) Why? RLS roles can only be assigned to Power BI workspaces where the dataset is published. The Viewer role assigned to consultants in the "Sales reports" workspace allows them to access reports, but RLS filters their data further based on the "Consultants" role definition.