When if the BEST time for automation to consider legal and/or standard requirements for a SUT?
When if the BEST time for automation to consider legal and/or standard requirements for a SUT?
The BEST time to consider legal and/or standard requirements for a System Under Test (SUT) is when designing a Test Automation Architecture (TAA). This ensures that the TAA is created in a manner that is legally compliant and meets all necessary standards from the outset, which is crucial for consistent and reliable testing.
The correct answer here is C! Ref from the syllabus: "In addition to the technical aspects of an SUT, the TAA design may need to respect legal and/or standards requirements so as to design the TAA in a compatible manner.", page 37 of 84
the TAA design may need to respect legal and/or standards requirements so as to design the TAA in a compatible manner.
I think C is correct. Legal standards should be considered when designing the TAA