A business analyst (BA) has been given a defect during user acceptance testing. After analyzing the defect, the BA determines it is a change in the requirement.
What does the BA need to do to assess the change?
A business analyst (BA) has been given a defect during user acceptance testing. After analyzing the defect, the BA determines it is a change in the requirement.
What does the BA need to do to assess the change?
When a business analyst identifies that a defect reported during user acceptance testing is actually a change in the requirement, they need to assess the impact of this change. Conducting an impact analysis using traceability helps the BA understand how the change in requirements affects various aspects of the project. It involves looking at all the elements that are connected to the requirement, such as other requirements, business needs, stakeholders, and test cases, to understand the breadth and depth of the impact. This thorough evaluation is critical to manage the change effectively and ensure that all potential consequences are taken into account.
Ans-D Impact analysis is performed to assess or evaluate the effect of a change. Traceability is a useful tool for performing impact analysis.(BABOK Page-92)
D=Conduct an impact analysis using traceability as per page 92 - Impact Analysis
Impact analysis