What happens when either the number of requirements or level of formality increase?
What happens when either the number of requirements or level of formality increase?
As the number of requirements or the level of formality increases, more effort is needed to trace requirements. This is because increased requirements or formality add complexity, necessitating detailed management and tracking to ensure all requirements are met and accurately monitored.
Babok: “The effort to trace requirements grows significantly when the number of requirements or level of formality increases.“
C is correct. Babok v3.0 pag 81.
C is correct. More effort is required to trace requirements when the level of formality or number of requirements increases.
Babok: “The effort to trace requirements grows significantly when the number of requirements or level of formality increases.“
C is correct
5.1.4 p. 1. Correct is C.
BABOK page 81
Refer babok 5.1.4
BABOK page 81
C. More effort is needed to trace requirements. Explanation: As the number of requirements or the level of formality increases, the complexity and the need for detailed management also increase. Specifically, the effort required to trace requirements grows significantly. This is because:
The effort to trace requirements grows significantly when the number of requirements or level of formality increases.
81 The effort to trace requirements grows significantly when the number of requirements or level of formality increases.
p. 81 The effort to trace requirements grows significantly when the number of requirements or level of formality increases.