C2010-555 Exam - Question 85


A company wants to receive rotating items that require inspection. What is the order of tasks necessary to do this?

Show Answer
Correct Answer: D

The correct order of tasks necessary for a company to receive rotating items that require inspection is to first receive the rotating items, then assign an asset number, and finally change the inspection status. Receiving the items is the initial step to acknowledge their arrival, assigning an asset number is required to track them within the system, and finally, changing the inspection status confirms that the items have been inspected. This sequence ensures that the items are properly logged, tracked, and verified.

Discussion

5 comments
Sign in to comment
VaheeOption: B
Jul 21, 2020

answer is B

rasmagao
Jul 27, 2020

https://www.ibm.com/support/pages/receiving-rotating-items-maximo

ps_777Option: A
Nov 14, 2020

Answer is A https://www.ibm.com/support/knowledgecenter/SSFGJ4_7.6.0/com.ibm.mbs.doc/receipts/t_receive_material_rotate.html

YiorgosOption: B
Jan 7, 2021

The only possible answer is B The rotating item requires inspection as per the question. The Change Inspection Status action must be before Receive Rotating Items action for the items to appear.

aismail7000Option: A
Nov 21, 2021

Answer is A

maxbossOption: B
Nov 19, 2023

B is correct. WISP, Change inspection status, WASSET, assign asset#, Receive Rotating Items