A company wants to receive rotating items that require inspection. What is the order of tasks necessary to do this?
A company wants to receive rotating items that require inspection. What is the order of tasks necessary to do this?
The correct order of tasks necessary for a company to receive rotating items that require inspection is to first receive the rotating items, then assign an asset number, and finally change the inspection status. Receiving the items is the initial step to acknowledge their arrival, assigning an asset number is required to track them within the system, and finally, changing the inspection status confirms that the items have been inspected. This sequence ensures that the items are properly logged, tracked, and verified.
answer is B
https://www.ibm.com/support/pages/receiving-rotating-items-maximo
Answer is A https://www.ibm.com/support/knowledgecenter/SSFGJ4_7.6.0/com.ibm.mbs.doc/receipts/t_receive_material_rotate.html
B is correct. WISP, Change inspection status, WASSET, assign asset#, Receive Rotating Items
Answer is A
The only possible answer is B The rotating item requires inspection as per the question. The Change Inspection Status action must be before Receive Rotating Items action for the items to appear.