Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?
A Condition Monitoring Point with a GAUGE Meter Type is triggered by crossing the Action Limit. This limit represents the threshold at which specific actions, such as creating work orders, are initiated to address potential issues indicated by the meter's readings.
https://www.ibm.com/support/pages/condition-monitoring-maximo
D is correct. Warning is the first level and Action is the second level. When the second level is breached (upper or lower levels) then work orders are triggered.
Yes, vote for D!
D is Correct. https://www.ibm.com/support/pages/condition-monitoring-maximo
For GAUGE meters you can also enter the upper/lower warning limits https://maximosecrets.com/2022/07/15/meters-meter-groups-and-condition-monitoring-2/#condition-monitoring