C2010-555 Exam - Question 62


An asset has an associated meter, RUNHOURS, and the Reading Type is set to ACTUAL. The asset will require maintenance every 500 hours of operation.

What must the PM configuration include?

Show Answer
Correct Answer: AB

To configure a PM (Preventive Maintenance) that triggers maintenance every 500 hours of operation for an asset, the configuration must include associating the RUNHOURS meter with the PM, setting the meter frequency to 500 hours, and ensuring that work orders are generated based on actual meter readings. Modifying the meter's reading type to DELTA is unnecessary because the reading type is already set to ACTUAL, which is appropriate for this requirement. Therefore, option B is correct as it properly includes associating the RUNHOURS meter, setting the meter frequency to 500, and checking the option to generate work orders based on actual meter readings without estimation.

Discussion

6 comments
Sign in to comment
Sindhu_TyroOption: B
Dec 9, 2020

I feel Answer is B

Sindhu_Tyro
Dec 9, 2020

https://www.ibm.com/support/knowledgecenter/SSZQTT_7.6.1/com.ibm.mbs.doc/pm/t_define_freq_meter_based_pm.html

PucibOption: D
Mar 1, 2021

it is D

palsujOption: B
Apr 29, 2021

I think the Answer is B - RUNHOURS just needs to be CONTINUOUS - not sure why DELTA is require(Per D)

Giovannix1Option: B
Jul 26, 2023

B is correct

maxbossOption: B
Nov 19, 2023

B is correct