H12-811 Exam QuestionsBrowse all questions from this exam

H12-811 Exam - Question 36


When both ends running PPP protocol detect that the physical link is active, the link state will transit from dead to establish. Which of the following protocols is used to negotiate the link parameters during this phase?

Show Answer
Correct Answer: C

When both ends running PPP detect that the physical link is active and transition from the Dead phase to the Establish phase, the protocol used to negotiate link parameters is the Link Control Protocol (LCP). LCP is responsible for establishing, configuring, and testing the data link connection in a PPP link.

Discussion

3 comments
Sign in to comment
buggybombastis10Option: C
May 12, 2023

The answer i think is C. LCP

hafizhouOption: C
Dec 2, 2023

C. LCP (Link Control Protocol) Lorsque les deux extrémités exécutant le protocole PPP détectent que la liaison physique est active, l'étape de négociation des paramètres de liaison est gérée par le protocole LCP (Link Control Protocol)

FerioSiqueiraOption: C
Feb 16, 2024

When both ends running PPP detect an active physical link and transition from the Dead phase to the Establish phase, the protocol used to negotiate link parameters is the Link Control Protocol (LCP).