During STP calculation, the port cost is associated with the port bandwidth by default. Which of the following statements about the relationship between port cost and port bandwidth is true?

Show Answer
Correct Answer: A,B

In the Spanning Tree Protocol (STP) calculation, port cost is inversely related to port bandwidth. This means that as the bandwidth of a port increases, the associated port cost decreases. Higher bandwidth ports are more efficient and desirable for network paths, hence they are assigned lower costs to prioritize them in the path selection process.

Discussion

9 comments
Sign in to comment
miftah_rahmanOption: A
Jan 18, 2023

higher bandwidth means smaller port cost, answer is A

Ja10mOption: A
Feb 7, 2023

A higher bandwidth means smaller port cost, answer is A

izzraihanOption: A
Jan 24, 2023

A is make sense, so because if the bandwidth is higher on the port, the resulting cost is small

ekirira22Option: A
Apr 7, 2023

Answer is A. https://vceguide.com/which-of-the-following-statements-about-the-relation-between-port-cost-and-port-bandwidth-is-true/

SilveiraOption: A
Apr 13, 2023

maior largura de banda, menor custo de porta, a resposta é A

NickENGOption: A
Jul 6, 2023

Correct answer is A, the cost will be less if the bandwidth is higher.

IbgentleOption: A
Jul 20, 2023

I don't know who is upvoting B here, but it's so wrong! If I have a bigger pipe, more water will flow in less time to fill my tanks! You see, cost is about time and completeness of the delivery of anything - whether in networking or any other area of life. Don't get it twisted.

ahmedhellopacket
Sep 14, 2023

did you take the exam ?

hafizhouOption: A
Dec 2, 2023

AAAAAA

FerioSiqueiraOption: A
Feb 16, 2024

Higher bandwidth always means smaller port cost. The answer is A.