HOTSPOT -
A solution integrator is installing new equipment to the rack.
Click the recommended location for HPE R/T3000 Extended Runtime Module.
Hot Area:
HOTSPOT -
A solution integrator is installing new equipment to the rack.
Click the recommended location for HPE R/T3000 Extended Runtime Module.
Hot Area:
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top. https://images10.newegg.com/UploadFilesForNewegg/itemintelligence/HP/c028811691403932391261.pdf Page 2 At the bottom should be right. As the Battery must be heavy (82 lbs/37 kg).
where is answer? I thing HPE R/T3000 Extended Runtime Module Must placed to the bottom