HPE0-S54 Exam QuestionsBrowse all questions from this exam

HPE0-S54 Exam - Question 14


Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb

F8 modules.

The customer wants to:

✑ add a second frame before they move into production

✑ have unified management

have a separate logical enclosure for each frame

What are the basic steps to add the second frame? (Choose three.)

Show Answer
Correct Answer: ABE

To add a second frame and achieve unified management while maintaining separate logical enclosures for each frame, the following steps should be taken: First, move the standby composer to the second frame to ensure redundancy and unified management. Second, disconnect the existing management ring and then cable the Frame Link Modules (FLMs) in the two frames to ensure proper communication between them. Finally, move one of the uplinks from the FLM in the first frame to the FLM in the second frame to establish connectivity between the frames. These steps are essential to successfully add the second frame while meeting the customer's requirements.

Discussion

1 comment
Sign in to comment
JKNGOptions: BDE
Mar 22, 2021

Answer should be B, D, E. Option A is possible but only 3 choices are allowed.