You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?
The answer in A.
The answer is A.
The correct is B. The Maintenance Utility is used to block the failing power supply (PS) before physically replacing it