Unused reports need to be disabled manually to prevent unnecessary load on the system.
Unused reports need to be disabled manually to prevent unnecessary load on the system.
Unused reports do not need to be disabled manually because the system automatically disables them if they are not checked for a specified period, such as two weeks for a weekly report.
B https://help.mypurecloud.com/articles/troubleshoot-reports/
reports will automatically disable if 2 failed attempts
Not really. These reports will be disabled automatically, after twice the amount it it configured. E.g.: For weekly report, if you don't chek it for two weeks, the system disables it.