Exam nse7_sdw-72 All QuestionsBrowse all questions from this exam
Question 25

The SD-WAN overlay template helps to prepare SD-WAN deployments. To complete the tasks performed by the SD-WAN overlay template, the administrator must perform some post-run tasks.

What are three mandatory post-run tasks that must be performed? (Choose three.)

    Correct Answer: B, C, D

    After running the SD-WAN overlay template, three mandatory post-run tasks include: assigning a branch_id metadata variable to each branch device to ensure correct identification and management of branch devices, creating policy packages for branch devices to manage their traffic and security policies appropriately, and configuring SD-WAN rules to define the behavior and routing of network traffic over the SD-WAN environment. These tasks ensure that the SD-WAN deployment functions correctly and efficiently.

Discussion
alejandrofern43Options: BCD

B,C,D pag 75 study guide 7.2

LoukasROptions: BCD

B,C,D pg 76 study guide

gogudindealOptions: BCD

BCD Page 76 study guide

ee0808Options: BCD

BCD Policy packages are not created with SD-WAN overlay template Routing is provided by BGP templates created with SD-WAN overlay template

Tommy_SOptions: BCD

B,C,D are correct. See study guide p76

sugar12Options: BCD

BCD page 75

truserudOptions: BCD

B, C & D are correct. This is detailed on page 76 in the Study Guide.

KavinTOptions: BCD

Answer is B, C, D

KavinTOptions: BDE

B & D & E are correct. A is not correct - SD WAN ID cannot be assigned. B is not correct - Routing needs to be done first.

truserud

You answered that BDE is correct, but then you are saying that B is not correct? B is also correct as the metafield branch_id is created by the overlay template as stated on page 76 in the study guide. E is incorrect, as that is created with the BGP template created by the SD-WAN overlay template.