Question 47

DRAG DROP -

An architect is configuring BCSD to design SRDF/S between two new PowerMax arrays. The architect has completed the tasks for the local side of the solution, including RA Port Group, Replication Group, and site switch.

What is the correct order of steps the architect needs to take to complete the SRDF setup?

    Correct Answer:

Discussion
TrinhLK

network circuit switch array replication port group replication group