PAM-SEN Exam QuestionsBrowse all questions from this exam

PAM-SEN Exam - Question 97


DRAG DROP

-

Arrange the steps to failover to the DR CPM in the correct sequence.

Show Answer
Correct Answer:

Discussion

2 comments
Sign in to comment
Cavdog
Sep 7, 2023

Sequence is as follows: 1. Validate that the Primary CPM's services are stopped and set to manual. 2. On the DR CPM, confirm details in the Vault.ini configuration file, reset the password to the CPM user, and recreate the credential file. 3. Enable the CPM services on the DR CPM. 4. Review logs to confirm the DR CPM services are running as expected. https://docs.cyberark.com/PAS/13.2/en/Content/PAS%20INST/CPM-DR-switch-between-CPMs.htm

Kai21
Aug 12, 2023

Answer: 1) Validate that the Primary CPM's services are stopped and set to manual. 2) On the DR CPM, confirm details in the Vault.ini configuration file, reset the password to the CPM user, and recreate the credential file. 3) Enable the CPM services on the DR CPM. 4) Review logs to confirm the DR CPM services are running as expected. Url: https://docs.cyberark.com/PAS/11.1/en/Content/PAS%20INST/CPM-in-DR-mode.htm