PAM-DEF Exam QuestionsBrowse all questions from this exam

PAM-DEF Exam - Question 92


Before failing back to the production infrastructure after a DR exercise, what must you do to maintain audit history during the DR event?

Show Answer
Correct Answer: A

To maintain audit history during a Disaster Recovery event, it is critical to ensure that the Production Instance replicates changes that occurred in the Disaster Recovery Instance. This ensures that any updates or modifications made during the DR event are captured and reflected in the production environment's audit history, maintaining continuity and accuracy of data.

Discussion

5 comments
Sign in to comment
TacoTeoOption: A
Apr 19, 2023

It's A To maintain audit history during a Disaster Recovery (DR) event and before failing back to the production infrastructure, it is important to ensure that the Production Instance replicates any changes that occurred in the Disaster Recovery Instance. This typically involves synchronizing the data and configurations between the DR and production environments, so that any updates or modifications made during the DR event are captured and reflected in the audit history of the production environment.

DLEVYOption: A
Aug 3, 2023

It's A To maintain audit history during a Disaster Recovery (DR) event and before failing back to the production infrastructure, it is important to ensure that the Production Instance replicates any changes that occurred in the Disaster Recovery Instance. This typically involves synchronizing the data and configurations between the DR and production environments, so that any updates or modifications made during the DR event are captured and reflected in the audit history of the production environment.

DLEVYOption: A
Aug 17, 2023

It is A.

TakumiOption: B
Apr 11, 2023

The answer is B. https://docs.cyberark.com/Product-Doc/OnlineHelp/PAS/13.0/en/Content/PASIMP/Remote-Administration-for-the-Vault-DR-Vault.htm?tocpath=Administrator%7CComponents%7CDigital%20Vault%7COperate%20the%20CyberArk%20Vault%7CMonitor%20the%20Vault%7C_____1

abiurruncOption: B
Jun 6, 2024

To maintain audit history during a Disaster Recovery (DR) event in CyberArk, follow these steps: 1 - Initiate a Predefined DR Failover: 1.1 - In PAM - Self-Hosted environments, manually initiate a predefined DR failover process by adjusting the following parameters in the PADR.ini file.