Which one of the following is not a factor considered when calculating the Link Budget for an outdoor point-to-point WLAN bridge link?
Which one of the following is not a factor considered when calculating the Link Budget for an outdoor point-to-point WLAN bridge link?
The link budget calculation for an outdoor point-to-point WLAN bridge link typically includes factors such as operating frequency, receive antenna gain, and transmit power. MU-MIMO (Multi-User Multiple Input Multiple Output) capabilities of the bridges are not directly considered when calculating the link budget, as it primarily deals with how signals are transmitted and received in a multi-user environment rather than the basic power and gain parameters within a point-to-point link.
Received power (dBm) = transmitted power (dBm) + gains (dB) − losses (dB)